Pittman-Boulder Highway Water Line Replacement Project

Pittman-Boulder Highway Water Line Replacement Project

Work on this $3.54 million project began on March 20, 2017, with an anticipated completion in August 2017. The project is generally bordered by Galleria Drive to the north, Merlayne Drive to the south, Moser Drive to the east, and Boulder Highway to the west. Work includes:

  • Removal of cement pipe water line and installation of a new PTV water line
  • Installation of new fire hydrant assemblies, water service laterals and water meter boxes
  • New pavement,
  • Concrete sidewalks
  • Traffic control

Primary funding is through the city’s Department of Utility Services, with a small portion of funding for ADA ramp improvements funded by the Regional Transportation Commission (RTC) of Southern Nevada Fuel Revenue Indexing (FRI).