Public Works

Quality Control

Quality Control

Contact Quality Control
Phone 702-267-3100
Fax 702-267-3101

The Quality Control Division of Public Works is responsible for off-site inspections, materials testing, construction-contract administration and close-out/acceptance of infrastructure.

Inspections

Off-site inspections include all water mains, sewer mains, storm drains, streets, sidewalks, traffic signals and street lights. Quality Control provides inspections for developer-built infrastructure and city capital improvement projects. Inspections should be scheduled one business day before the work is to be done. Please call the inspection line at 702-267-3144 between the hours of 7:30 a.m. to 12 p.m. and 12:45 p.m. to 3 p.m. Monday through Friday to schedule your inspections.

Materials Testing

Includes concrete, aggregate base, pavement and backfill materials used in the construction of public streets, drainage channels, and structures. Our materials testing lab is accredited by the American Association of State Highway and Transportation Officials (AASHTO). Accreditation covers the city's quality management system and testing of asphalt mixture, soil and aggregate.

Construction-Contract Administration

Includes progress meetings, payment processing, submittal reviews, and project closeouts for capital improvement projects.

Closeout/Project Acceptance/Bonds

Includes bond reduction and release of developer-built projects and acceptance of public infrastructure like public streets, water mains, sewer mains, traffic signals, etc., for maintenance by the City of Henderson.

Additionally, Quality Control maintains a comprehensive database of concerns and requests for service related to the public rights-of-way, such as potholes, pavement patches, construction debris, construction noise and dust.